Zone Demolishing
|
(1) Staggered Arrangement (Pillar)
|
|
||||||||
|
(2) X Figure Arrangement (Pillar, Wall)
|
|
||||||||
|
(3) Cross Drilling (Beam)
|
|
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ||
| By N2H | ||||||||||||||||||||||||||||||||||
|
(1) Staggered Arrangement (Pillar)
|
|
||||||||
|
(2) X Figure Arrangement (Pillar, Wall)
|
|
||||||||
|
(3) Cross Drilling (Beam)
|
|