Drilling depends on the shape and circumstance of the structure.
(1) The breaking of a large block requires secondary breaking with a large rock breaker
(2) When breaking a large block into smaller pieces drilling is only required from one side.
(3)Vertical drilling is more complex when dealing with high walls.
(4) The breaking of a thick foundation requires secondary breaking with a large rock breaker.